Skip to content

fix: certify CJS measurement lifecycle - #1

Merged
clfhhc merged 1 commit into
mainfrom
codex/harden-cjs-lifecycle-acceptance
Jul 29, 2026
Merged

fix: certify CJS measurement lifecycle#1
clfhhc merged 1 commit into
mainfrom
codex/harden-cjs-lifecycle-acceptance

Conversation

@clfhhc

@clfhhc clfhhc commented Jul 29, 2026

Copy link
Copy Markdown
Contributor

Complete the standalone integration package acceptance boundary.

  • consume the cache-safe, cross-subpath-compatible @graphrefly/ts@0.6.4 floor
  • use the generic MeasurementAdapter/textMeasurementProvider seam directly
  • typecheck tests and remove the accidental Node 24 engine floor
  • prove packed ESM and CJS consumers both with and without the optional canvas peer
  • prove failed measurement deactivation is bounded and successful fake-canvas glyph-width measurement reaches exact outputs

Local proof: lint, typecheck, 2 tests, ESM/CJS/DTS build, npm pack, four runtime branches, and external-CWD consumers passed.

@clfhhc
clfhhc merged commit 26fcf62 into main Jul 29, 2026
1 check passed
@clfhhc
clfhhc deleted the codex/harden-cjs-lifecycle-acceptance branch July 29, 2026 00:42
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant